PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at the Sally ports Facing South-West.jpg Column enclosure at the 3rd floor Facing North (2).jpg Column enclosure at the 3rd floor Facing North.jpg Installed door frame and block work at corridor 149 next to Sprinkler Room Facing East.jpg Installing copper piping at the 2nd floor Facing East.jpg Installing motorized damper controllers at the 2nd floor Facing West.jpg Motorized damper at the 3rd floor Facing North.jpg
Previous pageNext page Installed door frame and block work at corridor 149 next to Sprinkler Room Facing East
Installed door frame and block work at corridor 149 next to Sprinkler Room Facing East